Télécharger Imprimer la page

Basalte 610-02 Manuel D'installation page 7

Publicité

Les langues disponibles

Les langues disponibles

In order to limit power loss in the cable,
we recommend using a star wiring from
the power supply to each single Puck.
Please do not install Pucks in cascade since
this will lead to high current and power
dropping in the connection cable.
We advise to automatically put the iPad/iPod
in standby mode when not in use to reduce
power consumption.
7

Publicité

loading

Produits Connexes pour Basalte 610-02