Télécharger Imprimer la page

Husky HPRO63TLOCKERRD Guide D'utilisation Et D'entretien page 6

Casier supérieur service professionnel de 63.5 po

Publicité

2
Attach the Top Lockers to the Hutch & Side Locker.
Open the Top Locker door.
Attach the Top Locker (A) using 4 pcs M8*60 flat bolts (AA) and 4 pcs washers (BB) with supplied Hex Key (DD) or
Hex Bit (HH) in the 4 corners.
Do not tighten bolts until both lockers are attached and flush.
Remove the 2 Side handles (B) from the Top Locker (A) and repeat Step 1 and 2 for the 2nd Top Locker installation.
AA
Once both Top Lockers are attached and the front and top edges are flush with the existing Hutch and Side Lockers,
then tighten all 8 bolts (AA). Be careful not to overtighten.
The Husky® Logo badge (C) is magnetic and can be moved to either side of the Top Locker.
If desired, the 2 Side Handles (B) can be attached to the ends of the Top Lockers, or removed.
BB
6
AA
BB

Publicité

loading

Ce manuel est également adapté pour:

Hpro63tlockerbl10016532421000000000