Install InstructIons
7. Use Tie Bar (part E) to connect and support the Cross Beam (part B) with Bolt
and Nut
8. Pick up one Channel (part D) and fix it to the assembled unit as shown in
detail #4 Repeat steps to install the rest of the Channels to the rack. Make sure
all the Channels are seated completely.
Detail #4
8. Drop the Wire Decks (part C) between the lower flanges of two Cross Beams
(part B) properly. Make sure the bottom support rails of the wire decks go all the
way into the slots of Cross Beams. As shown in detail #5
www.newageProducts.com
1 877 306 8930
need more information? try,
or
for answers to commonly asked questions.