Halfen HDB-Z
Marking the column's position...
Floor slab
... and the installation rows
Installation of the first two layers of main longitudinal reinforcement.
The specifications provided by the structural engineer must be observed.
Note: Consider enough spacings to allow for installing
and concreting to avoid conflict with the main
reinforcement, and to ensure the concrete is properly
16
planned
column
subbase or formwork
first row
compacted. Loosely place the longitudinal reinforcement
first, and wire-tie to the HDB-Z Elements only after the
HDB-Z Elements have been correctly installed.