Read the following instructions in their entirety before assembling and installing. Refer to the main installation instructions for further
information on the installation of the chimney system. Our chimney systems are designed for installation by a qualified person in
accordance with local building codes.
WEAR CUT RESISTANT GLOVES WHILE HANDLING METAL PARTS TO AVOID PERSONAL INJURY. SHARP EDGES OR PROJECTIONS
CAUTION:
CAN CUT YOU
ADJUSTABLE ATTIC
INSULATION SHIELD (AAIS)
This instruction addendum is intended to cover the installation of the new style
Adjustable Attic Insulation Shield (AAIS) until such time as the main instructions
are reprinted with these revisions incorporated. The AAIS replaces the old
styles (AIS - AISD) found in the main installation instructions. This Addendum
is intended to cover the installation of this new AAIS.
The function of the AAIS (or a complete enclosure) is to keep insulation from
coming into contact with the chimney outer wall. Certain insulations made of
cellulose fiber (old newspapers, processed wood) may ignite and smolder due
to heat trapped by contact with the chimney. When this smoldering fire reaches
ordinary wood framing, a smoldering fire may create noxious gases and cause
great property damage.
The Adjustable Attic Insulation Shield (AAIS) must be installed where a chimney
passes from a lower living space into an open attic space. The AAIS is to prevent
any debris or blown-in insulation from coming in direct contact with the outer
pipe. The AAIS has a two part shield (top shield adjust over the lower shield)
which allows for a depth of insulation from 12" to 22" plus the depth of the ceiling
joist. The height of the AAIS is to meet the insulation level requirement of the
National Building Code. It also incorporates a lower joist shield to protect the
joist area. See Figure 1.
Upper Adjustable Shield
Lower Fixed Shield
Base Plate
Telescoping Joist Shield
Figure 1 - Adjustable Attic
Insulation Shield (AAIS)
At each ceiling level where the chimney passes through the dwelling, install a
Firestop Spacer (FS), see Figures 2 and 6.
in the attic space will be enclosed (see Figure 7). When installing the AAIS
immediately above the Decorator Ceiling Support the Firestop Spacer is not
required (see Figure 3).
TOPVIEW OF
FIRESTOP SPACER
Figure 2 - Firestop Spacer (FS)
Selkirk Canada Corporation
950 South Service Road, Second Floor
Stoney Creek, On. L8E 6A2
Toll Free: 1.888.835.5475
©2021 AAIS
All Rights Reserved
LISTED
Tested to : CAN/ULC-S629 and UL 103 Type HT
12" - 22"
12" - 22"
It is also required when the chimney
BOTTOMVIEW OF
FIRESTOP SPACER
Form No 3013121
INSTALLATION INSTRUCTIONS - ADDENDUM
Adjustable Attic Insulation Shield (AAIS)
Figure 3 - Adjustable Attic
Insulation Shield (AAIS)
installed above the
Decorator Ceiling Support
Roof Joist
Chimney Section
Unenclosed
Attic Space
Ceiling Joist
(Framed all 4 sides)
Stove Pipe Adapter
Table 1 - Framing Dimension - Adjustable Attic Insulation Shield
CHIMNEY
6"
DIAMETER
14" X 14"
FRAMED
(356mm x 356mm)
OPENING
To Install:
The attic opening should be fully framed on all 4 sides (Figure 4) to
ensure the required 2 inches air space clearance to the chimney is
present as per the Framing Dimensions in Table 1.
Figure 4 - Attic opening to
be framed on all 4 sides
11/11/2021
SUPERVENT 2100 (JM)
SUPERPRO 2100 (ALT)
Deluxe Rain Cap
Storm Collar
Ventilated Flashing
Maximum insulation level
below bead
Adjustable Attic Insulation
Shield (AAIS)
Decorator Ceiling Support
7"
8"
15" X 15"
16" X 16"
381mm x 381mm
406mm x 406mm
Selkirk Corporation
5030 Corporate Exchange Blvd. SE
Grand Rapids, MI 49512
Toll Free: 1.800.433.6341
Printed in the United States

Publicité

loading

Sommaire des Matières pour Selkirk SUPERVENT 2100

  • Page 1 INSTALLATION INSTRUCTIONS - ADDENDUM Adjustable Attic Insulation Shield (AAIS) LISTED SUPERVENT 2100 (JM) SUPERPRO 2100 (ALT) Tested to : CAN/ULC-S629 and UL 103 Type HT Read the following instructions in their entirety before assembling and installing. Refer to the main installation instructions for further information on the installation of the chimney system.
  • Page 2 Slide the upper (adjustable) shield up as high as possible (keeping The upper shield can be trimmed down to ensure the AAIS will fit in a minimum of 1" overlap on the lower shield). Secure to lower fixed a low clearance area in the attic at the soffit end. Ensure the top of shield using the 4 sheet metal screws provided through the pre- the shield is 2"...
  • Page 3 INSTRUCTIONS D'INSTALLATION - ADDENDUM Protecteur d'isolant de grenier ajustable (AAIS) HOMOLOGUÉ SUPERVENT 2100 (JM) SUPERPRO 2100 (ALT) Testé selons : CAN/ULC-S629 et UL 103 Type HT VEUILLEZ LIRE LES DIRECTIVES ATTENTIVEMENT AVANT DE COMMENCER LE PROJET. RÉFÉREZ VOUS AUX INSTRUCTIONS PRINCIPALES POUR L'INSTALLATION DE LA CHEMIN/E.
  • Page 4 Glisser la partie supérieure du bouclier ajustable aussi haut que Le bouclier supérieur peut être taillé pour s'assurer que l'AAIS peut possible (en gardant un chevauchement d'au moins de 1 po sur le être installé dans une zone basse au grenier, spécifiquement à bouclier fixe).

Ce manuel est également adapté pour:

Supervent 2100 jmSuperpro 2100Superpro 2100 alt