Télécharger Imprimer la page

Champlain ACM-133 Instructions D'installation

Publicité

Liens rapides

ACM-133
Hardware
³
·
x 2
x 12
²
x 10
x 10
Handle
Yoke
Base
(A) Roller assembly:
• Attach handle to hub using one
• Slide base attachments (check for left and right fit) over base
and secure with three
• Insert pins
into tubes
roller bearings.
• Each hub attaches to aluminium tubing with two
tapping hexagon head screws (pre-drill holes using 5/32" bit).
(B) Attach straps:
µ
• Straps
should be attached to the solar cover using ten
¾
nylon plates, ten
µ
• Straps
should be attached to tubing using five
tapping hexagon head screws (pre-drill holes using 5/32" bit)
and solar cover at even intervals over the length and centered
with pool.
By: Champlain Plastics Inc.
87 Pillsbury Road, Rouses Point, NY 12979
»
x 9
º
x 2
(left)
Hub
Base
attachments
screw.
screws (pre-drill holes using 3/16" bit).
and place in yoke to create
nylon bolts and ten
nylon nuts.
¿
´
x 4
x 4
º
¾
x 2
x 10
(right)
Straps at
even intervals
A
Tubing
¿
IMPORTANT:
To determine strap spacing on tubing and solar
cover, measure maximum width of pool (inner
edges). Straps should be attached to tubing and
solar cover at even intervals over the length and
centered with pool.
Fold overlap before rolling the solar cover.
self
self
Tools required
for assembly:
-power drill
-hexagon socket
µ
x 5
-drill bit 5/32" & 3/16"
-Phillips screw driver
Fold solar cover
overlap
µ
B
Tubing
¾
µ
INS-ACM133rev1

Publicité

loading

Sommaire des Matières pour Champlain ACM-133

  • Page 1 (pre-drill holes using 5/32” bit) and solar cover at even intervals over the length and centered µ with pool. By: Champlain Plastics Inc. 87 Pillsbury Road, Rouses Point, NY 12979 INS-ACM133rev1...
  • Page 2 être attachées aux tubes avec cinq vis à intervalles réguliers sur la longueur et centré avec µ la piscine (trous pré-percage requis a l’aide d'un foret 5/32"). By/Par : Champlain Plastics Inc. 87 Pillsbury Road, Rouses Point, NY 12979 INS-ACM133rev1...