Télécharger Imprimer la page

Cristina NEW DAY CRIND222 Notice De Montage

Publicité

Liens rapides

MANUTENZIONE E PULIZIA - MAINTENANCE AND CLEANING - MAINTENANCE ET NETTOYAGE - PFLEGE UND REINIGUNG - MANTENIMIENTO Y LIMPIEZA -
UDR BA A IŠT NI - UDR BA A ISTENIE
sempre
substances or their derivatives, such as hydrochloric acid, muriatic acid, sulphuric acid, caustic soda, etc., and in any case do not use abrasive supports (e.g. metal or non-
Always make sure to rinse thoroughly in order to avoid the deposit of any residual cleaning product.
Toujours
siempre
GARANZIA - GUARANTEE - GARANTIE - GARANTIE - GARANTÍA - ZÁRUKA - ZÁRUKA
Tutti i prodotti
All
Tous les produits
Alle
DATI TECNICI - STANDARD SPECIFICATIONS - DONNEE TECHNIQUES - TECNISCHE STANDDARDDATEN - DATOS TÉCNICOS - TECHNICKÉ UDAJE - TECHNICKE UDAJE
1.
2.
Maximální pracovní tlak
3.
4.
For thermostats:
Für Thermostat:
5.
Für Thermostat:
6.
7.
8.
immer, dass Sie sorgfältig nachspülen, um Ablagerungen von
Presión max. de ejercicio
For thermostats: Pressure difference between hot and cold water
NEW DAY
CRIND222 | CRIND254 | CRIND264
ISTRUZIONI DI MONTAGGIO
INSTALLATION INSTRUCTIONS
NOTICE DE MONTAGE
MONTAGEANLEITUNG
INSTRUCCIONES DE MONTAJE
Le test d'installation en
CRISTINA S.r.l. a socio unico
CRIND222
110
155
95
ø48
ø33
max 40
ø63
360
35-55
ø40
G3/8
G1"1/4
CRIND254
140
170
110
ø48
max 40
ø33
360
CRIND264
140
170
110
ø48
max 40
ø33
ø63
360
35-55
ø40
G3/8
G1"1/4

Publicité

loading

Sommaire des Matières pour Cristina NEW DAY CRIND222

  • Page 1 Presión max. de ejercicio Maximální pracovní tlak CRIND264 For thermostats: Für Thermostat: For thermostats: Pressure difference between hot and cold water Für Thermostat: ø48 max 40 ø33 ø63 Le test d’installation en 35-55 ø40 G3/8 G1"1/4 CRISTINA S.r.l. a socio unico...
  • Page 2 MONTAGGIO E PEZZI IDENTIFICATIVI DI RICAMBIO - INSTALLATION AND SPARE PARTS - MONTAGE ET PIECES INDENTIFICATION L’INSTALLAZIONE DEVE ESSERE ESEGUITA DA PERSONALE QUALIFICATO! DE RECHANGE - MONTAGE UND ERSATZTEILE - MONTAJE E IDENTIFICACIÓN DE LAS PIEZAS DE RECAMBIO SPURGARE LE TUBAZIONI PRIMA DI COLLEGARE IL RUBINETTO ALL’IMPIANTO. INSTALLATION PERFORMED BY QUALIFIED PERSONNEL! BEFORE CONNECTING TO MAINS, BLEED THE PIPES TO AVOID DAMAGE.

Ce manuel est également adapté pour:

New day crind254New day crind264