Télécharger Imprimer la page

Champlain ACM-123 Mode D'emploi page 5

Publicité

ACM-123A - Step/Étape 5
Hardware • Jeu de pièces
x 2
To assemble adjustable feet:
Insert leg (8) into foot (7) and
secure using washer (10) and
screw (9). Snap cap (11) into
place. Repeat steps for
second foot.
Do not screw (9) to tight,
part #7 must be able to
slightly pivot.
NOTE: Assembled feet = P11
Note: Approx. 50 lbs (22,7kg) pea gravel
needed to complete installation
STEP 5
Carefully, add 50 lbs
(22,7kg) of pea gravel to
self-adjusting ballast (P10).
On underside of steps,
attach ballast (P10) to
steps (P1) using clamps (4)
and 8 screws (2).
Insert assembled
adjustable feet (P11) into
ballast (P10).
IMPORTANT:
Install ballast (P10) with
filling hole (A) to the left
(as shown).
By/Par : Champlain Plastics Inc.
87 Pillsbury Road, Rouses Point, NY 12979
º
x 2
¾
¸
A
·
P11
¾
x 2
Assemblage des pieds ajustables
º
Insérer la patte (8) dans le pied (7)
et attacher avec la vis (9) et la
rondelle (10). Placer le couvercle
(11). Répéter pour le second pied.
Ne pas visser (9) trop fort, la pièce
#7 doit être capable de pivoté
µ
légèrement.
Note: Pieds assemblés = P11
Note: Environ 50 lbs (22.7kg)
de petit gravillon seront nécessaires
afin de compléter l'installation.
E5
P1
P10
¿
P11
µ
¸
x 2
Ajouter soigneusement
50 lbs (22.7kg) de petit
gravillon au ballast
auto-ajustable (P10).
Attacher le ballast (P10) en
dessous des marches (P1)
en utilisant les crampons (4)
et 8 vis (2). Insérer
les pieds assemblés (P11)
¿
dans le ballast (P10)
·
Installer le ballast avec
le trou de remplissage (A)
vers la gauche
(tel qu'illustré).
x 2
Étape 5
IMPORTANT :
INS-1123A-rev1

Publicité

loading