Télécharger Imprimer la page

Husqvarna CTH130 Manuel D'instructions page 24

Publicité

2 2 2 2 2
1
1. Front bagger tube
2. Lower bagger tube
3. 1/4 x 50,8mm Carriage
Bolts
4. 1/4 Lock nut
2
1. Front bagger tube
2. 1/4 x 50,8mm Carriage
Bolts
3. 1/4 Lock nut
4. Vinyl Binding
5. Dump handle tube
6. Clevis pin
7. Retainer spring
3
1. Top Surfaces Even
2. Horizontal Adjustment Bracket
3. Vertical Adjustment Bracket
3
1. Handle
2. Retainer Spring
3. Pin
4. Plug
2
4
3
5
3
6
7
1
6MM (1/4") - 9MM (3/8")
1
2
1
4
To Assemble Bagger
Eng
NOTE: For ease of assembly, you may wish to obtain the
assistance of another person when putting the bagger to-
gether.
Assemble front and lower bagger tubes using four (4) 1/
4 x 50,8mm carriage bolts and lock nuts supplied. Tighten
securely.
Slide front and lower bagger tube assembly into the
bagger assemby.
Assemble front and upper bagger tubes using four (4) 1/
4 x 50,8mm carraige bolts and lock nuts supplied. Tighten
securely.
Slip all the vinyl bindings over the bagger tubes
Slide the bagger dump handle through the hole in the
bagger top, install the clevis pin and secure with retainer
spring.
NOTE: For future use, the clevis pin may be removed in order
to use the handle to clear the chute in the event it has become
clogged.
Bagger adjustment
For proper bag function and appearance, it may be neces-
sary to adjust the bagger assembly. There should be 6mm (1/
4")-9mm (3/8") gap between the bagger top and fender and
the bagger top surface should be even with the top surface
4
of the fender. To adjust bagger position:
Horizontal adjustment
Slightly loosen the nuts securing the bagger RH and LH
horizontal adjustment brackets. Loosen only enough so
the brackets keep their position, but allow them to be
moved.
Move the brackets the amount forward or backward you
wish the bag assembly to move. Retighten the nuts
securely.
Vertical adjustment
Slightly loosen the nuts securing the vertical adjustment
brackets. Loosen only enough so the brackets keep their
position, but allow them to be moved.
Move the brackets the amount up or down you wish the
bag assembly to move. Retighten the nuts securely.
Reinstall the bagger assembly and check the bagger to
fender fit. If necessary, repeat the procedure until proper
fit is attained.
To convert to bagging, mulching or discharge
See "Section 5" of this manual.
2
To assemble and install mulcher plug
Remove spring retainer and pin from handle.
Insert plug into handle. Make sure that the letter "A" on
both the plug and handle are on the same side and that
they can both be seen from the top when laying on the
ground.
Secure with pin and retainer spring provided. For instal-
lation see "To Convert Mower" in Section 5 of this manual.
24

Publicité

loading