INSTALLATION
1.
Verify the gas type and pressure, and make sure that they conform to those marked on the rating label. If
incorrect gas type/pressure is connected, it may damage the performance of the device and create safety
hazards.
2.
Before installing the gas pipeline, please install the appliance in an ultimate-use position. Adjust the height
of the appliance on all 4 leveling legs using a water level to make sure the device in a level state. After
installing the gas pipeline, check the level state of the device again.
3.
According to requirement of local standard and strong recommendation of the manufacturer, a gas shut-off
valve may be needed between the gas supply pipeline and gas-pressure regulator. Whether the installation
of the gas shut-off valve has any requirements in the local standard should be judged by the gas installation
personnel.
9