Télécharger Imprimer la page

Magic Chef MCCTG24A Manuel D'utilisation page 9

Gril thermo/manuel

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
1.
Verify the gas type and pressure, and make sure that they conform to those marked on the rating label. If
incorrect gas type/pressure is connected, it may damage the performance of the device and create safety
hazards.
2.
Before installing the gas pipeline, please install the appliance in an ultimate-use position. Adjust the height
of the appliance on all 4 leveling legs using a water level to make sure the device in a level state. After
installing the gas pipeline, check the level state of the device again.
3.
According to requirement of local standard and strong recommendation of the manufacturer, a gas shut-off
valve may be needed between the gas supply pipeline and gas-pressure regulator. Whether the installation
of the gas shut-off valve has any requirements in the local standard should be judged by the gas installation
personnel.
9

Publicité

loading