Télécharger Imprimer la page

Samsung NE59T7851WG/AC Manuel D'installation page 7

Masquer les pouces Voir aussi pour NE59T7851WG/AC:

Publicité

Les langues disponibles

Les langues disponibles

STEP 3. INSTALLING THE POWER CORD
For power cord installations, hook the strain relief over the power cord hole (1
rear of the drawer body. Insert the power cord through the strain relief and tighten the device.
Power cord
• You must install the power cord with a strain relief.
• Attach the strain relief to the 1
Installing a 3-wire power cord
WARNING
WARNING
neutral terminal located in the center of the terminal block. The power leads must be connected to the
lower left and the lower right terminals of the terminal block.
1. Remove the 3 lower terminal screws from the
terminal block.
2. Insert the 3 terminal screws through each
power cord terminal ring and into the lower
terminals of the terminal block. Be certain that
the center wire (white/neutral) is connected to
the center lower position of the terminal block.
3. Tighten screws securely into the terminal
block. DO NOT remove the ground strap
connection.
4. Go to step 5 on page 10 and proceed with
the installation.
CAUTION
CAUTION
Live 1 - Neutral
Live 2 - Neutral
Live 1 - Live 2
Manual Installation_30 Oven_SECA_DG68-00109F-08_EN+CFR.indb 7
Conduit connection plate
Strain relief
/
" opening in conduit connection plate.
3
8
The neutral or ground wire of the power cord must be connected to the
You must check voltage after connecting power cord.
120 V
120 V
208 V / 240 V
English - 7
/
") located below the
3
8
Neutral
terminal
White
Black
Live 1
White
Black
Ground strap
Red
Live 2
Red
9/6/2018 6:52:52 PM

Publicité

loading

Ce manuel est également adapté pour:

Ne59j7850wg