Télécharger Imprimer la page

Cristina BLADE CRIBA100 Notice De Montage

Publicité

Liens rapides

MANUTENZIONE E PULIZIA - MAINTENANCE AND CLEANING - MAINTENANCE ET NETTOYAGE - PFLEGE UND REINIGUNG - MANTENIMIENTO Y LIMPIEZA -
UDR BA A IŠT NI - UDR BA A ISTENIE
sempre
substances or their derivatives, such as hydrochloric acid, muriatic acid, sulphuric acid, caustic soda, etc., and in any case do not use abrasive supports (e.g. metal or non-
Always make sure to rinse thoroughly in order to avoid the deposit of any residual cleaning product.
Toujours
siempre
GARANZIA - GUARANTEE - GARANTIE - GARANTIE - GARANTÍA - ZÁRUKA - ZÁRUKA
Tutti i prodotti
All
Tous les produits
Alle
DATI TECNICI - STANDARD SPECIFICATIONS - DONNEE TECHNIQUES - TECNISCHE STANDDARDDATEN - DATOS TÉCNICOS - TECHNICKÉ UDAJE - TECHNICKE UDAJE
1.
2.
Maximální pracovní tlak
3.
4.
For thermostats:
Für Thermostat:
5.
Für Thermostat:
6.
7.
8.
immer, dass Sie sorgfältig nachspülen, um Ablagerungen von
Presión max. de ejercicio
For thermostats: Pressure difference between hot and cold water
BLADE
CRIBA100 | CRIBA107 | CRIBA401
ISTRUZIONI DI MONTAGGIO
INSTALLATION INSTRUCTIONS
NOTICE DE MONTAGE
MONTAGEANLEITUNG
INSTRUCCIONES DE MONTAJE
CRIBA100
G1/2
G1/2
83
170
Le test d'installation en
+15
150
-15
ø65
196
CRISTINA S.r.l. a socio unico
CRIBA107
G1/2
185
G1/2
83
ø38
170
1500
+15
240
150
-15
240
ø65
196
CRIBA401
G1/2
G1/2
79
155
+15
240
150
-15
ø65

Publicité

loading

Sommaire des Matières pour Cristina BLADE CRIBA100

  • Page 1 Maximální pracovní tlak For thermostats: Für Thermostat: CRIBA100 CRIBA107 CRIBA401 For thermostats: Pressure difference between hot and cold water Für Thermostat: G1/2 G1/2 G1/2 G1/2 G1/2 G1/2 ø38 Le test d’installation en 1500 ø65 ø65 ø65 CRISTINA S.r.l. a socio unico...
  • Page 2 MONTAGGIO E PEZZI IDENTIFICATIVI DI RICAMBIO - INSTALLATION AND SPARE PARTS - MONTAGE ET PIECES INDENTIFICATION L’INSTALLAZIONE DEVE ESSERE ESEGUITA DA PERSONALE QUALIFICATO! DE RECHANGE - MONTAGE UND ERSATZTEILE - MONTAJE E IDENTIFICACIÓN DE LAS PIEZAS DE RECAMBIO SPURGARE LE TUBAZIONI PRIMA DI COLLEGARE IL RUBINETTO ALL’IMPIANTO. INSTALLATION PERFORMED BY QUALIFIED PERSONNEL! BEFORE CONNECTING TO MAINS, BLEED THE PIPES TO AVOID DAMAGE.

Ce manuel est également adapté pour:

Blade criba107Blade criba401