Assembly
Step 2
2.1 Insert a junction bar (G) halfway into the track (B)
and attach using a screw (M). Insert the other
half of the junction bar (G) into the track (C),
DO NOT screw the junction bar (G) to the
track (C) now.
2.2 Attach the track (B and C) together using the
screws (N), the screw caps (L) and the cap nuts (P)
as illustrated.
Repeat for all remaining tracks (B and C).
2.3 Insert a junction bar (G) halfway into the track (C1)
and attach using a screw (M). Insert the other
half of the junction bar (G) into the track (B1),
DO NOT screw the junction bar (G) to the
track (B1) now.
2.4 Attach the track (C1 and B1) together using the
screws (N), the screw caps (L) and the cap nuts (P)
as illustrated.
Repeat for all remaining tracks (C1 and B1).
Parts required for this step / Pièces requises pour cette étape :
C1
8
B1
2
X
2
X
AssemblAge
Étape 2
2.1 Insérer la barre de jonction (G) à mi-chemin dans
le rail (B) et attacher avec une vis (M). Insérer l'autre
moitié de la barre de jonction (G) dans le rail (C),
NE PAS attacher la barre de jonction (G) au rail (C)
maintenant.
2.2 Attacher les rails (B et C) ensemble en utilisant les
vis (N), les couvre-vis (L) et les écrous borgnes (P)
tel qu'illustré.
Répéter pour les rails (B et C) restants.
2.3 Insérer la barre de jonction (G) à mi-chemin dans
le rail (C1) et attacher avec une vis (M). Insérer l'autre
moitié de la barre de jonction (G) dans le rail (B1),
NE PAS attacher la barre de jonction (G) au rail (B1)
maintenant.
2.4 Attacher les rails (C1 et B1) ensemble en utilisant les
vis (N), les couvre-vis (L) et les écrous borgnes (P)
tel qu'illustré.
Répéter pour les rails (C1 et B1) restants.
B
2
X
C
2
X
© Sojag inc. 2016
L
G
4
X
M
P
8
X
N
8
X
12
X
4
X