Télécharger Imprimer la page

Cristina BOLLICINE CRIBO256 Notice De Montage

Publicité

Liens rapides

MANUTENZIONE E PULIZIA - MAINTENANCE AND CLEANING - MAINTENANCE ET NETTOYAGE - PFLEGE UND REINIGUNG - MANTENIMIENTO Y LIMPIEZA -
UDR BA A IŠT NI - UDR BA A ISTENIE
sempre
substances or their derivatives, such as hydrochloric acid, muriatic acid, sulphuric acid, caustic soda, etc., and in any case do not use abrasive supports (e.g. metal or non-
Always make sure to rinse thoroughly in order to avoid the deposit of any residual cleaning product.
Toujours
siempre
GARANZIA - GUARANTEE - GARANTIE - GARANTIE - GARANTÍA - ZÁRUKA - ZÁRUKA
Tutti i prodotti
All
Tous les produits
Alle
DATI TECNICI - STANDARD SPECIFICATIONS - DONNEE TECHNIQUES - TECNISCHE STANDDARDDATEN - DATOS TÉCNICOS - TECHNICKÉ UDAJE - TECHNICKE UDAJE
1.
2.
Maximální pracovní tlak
3.
4.
For thermostats:
Für Thermostat:
5.
Für Thermostat:
6.
7.
8.
immer, dass Sie sorgfältig nachspülen, um Ablagerungen von
Presión max. de ejercicio
For thermostats: Pressure difference between hot and cold water
BOLLICINE
CRIBO256 | CRIBO956
ISTRUZIONI DI MONTAGGIO
INSTALLATION INSTRUCTIONS
NOTICE DE MONTAGE
MONTAGEANLEITUNG
INSTRUCCIONES DE MONTAJE
CRIBO256 - CRIBO956
95
95
G1/2 x 2 ingressi
G1/2 x 2
G1/2 x 2 ingressi
G1/2 x 2
172
Le test d'installation en
172
100
CRISTINA S.r.l. a socio unico
235
235
102
102
only BO256
ø64
ø64
5-55
ø41
5-55
ø41
ø50
ø50
G1"1/4
100
G1"1/4

Publicité

loading

Sommaire des Matières pour Cristina BOLLICINE CRIBO256

  • Page 1 For thermostats: Pressure difference between hot and cold water G1/2 x 2 ingressi G1/2 x 2 Für Thermostat: G1/2 x 2 ingressi G1/2 x 2 only BO256 ø64 Le test d’installation en ø64 5-55 ø41 5-55 ø41 ø50 ø50 G1"1/4 G1"1/4 CRISTINA S.r.l. a socio unico...
  • Page 2 MONTAGGIO E PEZZI IDENTIFICATIVI DI RICAMBIO - INSTALLATION AND SPARE PARTS - MONTAGE ET PIECES INDENTIFICATION L’INSTALLAZIONE DEVE ESSERE ESEGUITA DA PERSONALE QUALIFICATO! DE RECHANGE - MONTAGE UND ERSATZTEILE - MONTAJE E IDENTIFICACIÓN DE LAS PIEZAS DE RECAMBIO SPURGARE LE TUBAZIONI PRIMA DI COLLEGARE IL RUBINETTO ALL’IMPIANTO. INSTALLATION PERFORMED BY QUALIFIED PERSONNEL! BEFORE CONNECTING TO MAINS, BLEED THE PIPES TO AVOID DAMAGE.

Ce manuel est également adapté pour:

Bollicine cribo956