Télécharger Imprimer la page

LevelOne Managed Switch Serie Guide D'installation Rapide page 4

Masquer les pouces Voir aussi pour Managed Switch Serie:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 10
2. Installed on the working table
Install the switch on a working table, and the installation steps are as follows:
l
Place the switch with its bottom up on a sufficiently large, stable and properly-grounded working
table;
l
Flip over the switch, and place it on the working tablestably;
l
Use a power cord to connect the switch power connector with the power socket.
l
The switch uses 100-240V, 50/60Hz AC, and make sure that both power supply and grounding are
normal before power on.
After power on, please check the switch's power indicator (Power) is on, and if so, it indicates that
l
the power supply is connected properly.
l
Do not place heavy objects on the top of the switch.
Perform Initial Configuration
l Connect PC to the switch console port using console cable.
l Configure the PC's serial port: 38400 bps, 8 characters, no parity, one stop bit, 8 data bits, and no
flow control.
l Log in to the CLI using default settings: Username "admin" and password "admin."
Note:
For further information on switch configuration, refer to the CLI Reference Guide and Web
Management Guide.
Logging on to the equipment
l
Connect the RJ-45 interface cable of a switch with a computer using a network cable.
Set the TCP/IP properties of the computer, see the Appendix: Setting up yourcomputer.
l
l
Logging on to the equipment: Open a browser and type 192.168.1.1 in the address bar, and then
press Enter; in the pop-up login interface, enter the factory logon username "admin", password
"admin" and click OK.
- 3 -

Publicité

loading

Ce manuel est également adapté pour:

A00575