Télécharger Imprimer la page

Palram Essence 8x1 2 TwinWall Glazing Mode D'emploi page 2

Publicité

IMPORTANT
Please read
these
instructions carefully before you start to assemble this greenhouse.
Keep
these
instructions
in
a
safe
place
for future
reference.
»
Customer Service
For
assistance
with
assembly or for replacement parts
-
please log
onto our website
or
call
our
service line
(number
is
on the
title
page).
Additional information
can be
found
at
our website: www.palramapplications.com
»
Safety Advice
It
is
of utmost importance to
assemble
all
of
the parts according to the directions.
Do
not
skip any step.
We
strongly recommend
using
work
gloves during assembly.
Always
wear
shoes and safety
goggles when working with extruded aluminium.
If using
a
step ladder or power tools ensure
that you follow the manufacturer's
safety advice.
Do
not touch overhead power cables
with
the aluminium profiles.
Do
not
attempt
to assemble the greenhouse
in
windy or wet conditions.
Dispose
of
all
plastic
bags. Keep
them out of
reach
of
small
children.
Keep
children away from the assembly
area.
Do
not
lean
against or push the greenhouse during construction.
Do
not position your greenhouse
in an area
exposed to excessive wind.
Do
not
attempt
to assemble this greenhouse if you
are
tired,
have
taken drugs or
alcohol or if you
are
prone to dizzy
spells.
Hot items such
as
recently
used
grills,
blowtorches
etc.
must not
be
stored
in
the
greenhouse.
Ensure
there
are no
hidden
pipes or cables
in
the ground before
inserting the
pegs.
This
product
is
designed to
be used
as
a
greenhouse only.
»
Care &
Maintenance
When
your greenhouse
needs
to
be
cleaned,
use
a
mild detergent solution and
rinse
with
cold
clean
water.
DO NOT use
acetone, abrasive cleaners or
other
special
detergents to
clean
the clear
panels.
It
is
recommended to check periodically that roof
panels caps (plastic
part
329 &
profile
981) are set in place.
»
Tools
&
Equipment
Tape
measure
Work gloves
Lubricant
Phillips head screwdriver
Leveler
Silicone spray
Rubber
mallet
Large
Hammer
Adjustable Spanner
/Wrench
T001
-
Special
tool for
Screws
411
and nuts
412
O
»
Before
Assembly
Q
Selecting
a
site:
-
The
greenhouse must
be
positioned
and fixed on
a
flat
level surface.
-
Choose
a
sunny position away
from
overhanging
trees.
Q
We
strongly recommend
this
greenhouse being secured directly to
a
solid concrete
foundation.
When
doing
that
use
the
pre
drilled
holes
in
the
metal
base.
Q
This
is a
multi -part assembly
best
achieved
by
two
people.
Allow
at least
a
half
a
day for the assembly
process.
Q
Take all
components
&
parts
out of the
packages. Sort
the parts and check
against the
contents parts
list.
Parts
should
be laid
out
close at hand.
Keep all small parts (screws etc.) in
a
bowl
so
they do not get
lost.
Q
Please
note multi -sided profiles
are used
in
this greenhouse.
As
a
result some
holes
in
the profiles
are
not
used
during
assembly.
Q
Please
review entire instructions before
starting. Carry
out the
assembly
steps in
exact order.
»
Notes
During Assembly
You
may
use
Silicon
lubricant
spray
in
order to help
you slide the panels
into the
profiles.
Do
not
spray
the Polycarbonate
panels.
Use
a
rubber mallet if
necessary.
During assembly you will encounter the information
icon, please refer
to the relevant assembly step for
additional comments and
assistance.
Step
3: Part
7063
is
the greenhouse threshold.
Fixing it
determines the front
side
of
the greenhouse.
Step 10:The
oval hole
in
the
crossbars
256 should
always
be assembled
to the
base
of
the greenhouse.
Step 24:
Part
7180
is
used
for assembly
assistance.
Step 32: Dismantle
Part
7180 and
re-
implimant
in
Step 33
Step 39: After installing the gutter,
it
is
mandatory to
remove
Part
7180
and discard.
Step 55: Decide on the window's location before
assembly.
Windows
can be
installed
in
two of the indicated options.
Step 69:
In
case
the
window
is
not closed properly, please
release
the
screws,
adjust the profile and tighten the
screw.
A\
Important
Recommendations
Firmly connect the greenhouse to
a
level
position
immediately after completion
of
the
assembly.
In
order to anchor the greenhouse
use
the
designated manufacturer anchoring kit.
Anchoring the greenhouse
can also be
done by
drilling
the
base
profiles and fastening it to the
ground using ground
screws
or spikes
(screws and
spikes are
not supplied).
Tighten
all screws
once assembly
is
completed.
Screws
411
and nuts
412 are used
throughout the
assembly
process.
Screws
411
are
to
be
assembled from the outside and nuts
412
from the inside
of
the
greenhouse.
If
not specified otherwise, do not fasten
screws and nuts
(411 &
412)
more than
2
-3
turns only.
Do
not
tighten them until completion of
the panels' assembly.
These
2
icons
indicate if screws'tightening
is
required or not.
However,
in
some steps,
temporary tightening of
a
few
screws may be
needed to prevent
a
profile from falling.
N
>
1
o_

Publicité

loading