1
Determine location for oat switch.
Switch plug
Pump plug
Adjust pumping range.
3
lift rod
oat
oat stop
Activation level
Pumping range
Secure oat switch to discharge pipe by inserting
2
the hose clamp through the mounting bracket
slots and tightening the hose clamp.
Hose clamp
For units without plugs, connect wires as shown.
4
In 230 VAC installations, one side of the line
going to the load is always HOT. This condition
exists if the switch is on or o . Install double pole
disconnect on all 230 VAC circuits. Ensure cable
connections are performed in a dry junction box or
other watertight seal that seals both conductors
and cable jacket. Failure to do so could result in
electrical shock hazard and/or water traveling down cable and
entering the switch. Failure to guard against this may a ect switch
performance.
5
Test unit after installation to ensure proper
operation.
Mounting bracket