Télécharger Imprimer la page

Elkay LZOTL8WS1A Serie Manuel D'installation Et Utilisation page 14

Masquer les pouces Voir aussi pour LZOTL8WS1A Serie:

Publicité

INSTRUCTIONS TO MOVE THE BOTTLE FILLER & BASIN
TO THE LEFT SIDE (NON-REFRIGERATED) FOR ALTERNATE MOUNTING
Using a 5/16" socket, remove
the (4) screws from the bottom
of each cooler to remove the
wrappers.
Refrigerated Cooler side:
Carefully lift and tip the shroud/basin
assembly off of the cooler frame.
Only disconnect the (2) black wires
coming from the shroud assembly that
go to the solenoid valve and to the cold
control.
Disconnect the water line at the solenoid
valve. Reference (Fig. 27, Pg.19) for the
operation of the quick connect fittings.
Non-Refrigerated Cooler side:
Carefully lift and tip the shroud/basin
assembly off of the cooler frame.
Only disconnect the (2) black wires
coming from the shroud assembly going
to the solenoid valve and to the power
cord.
Disconnect the water line at the solenoid
valve. Reference (Fig. 27, Pg.19 ) for the
operation of the quick connect fittings.
1000005926 (Rev. C - 08/21)
EZOTL8WS*1A LZOTL8WS*1A
VERSATILE BI-LEVEL
Using a #T20 (6 point star bit),
loosen the shroud screws.
Both sides, both coolers.
Page 14
Fig. 14
ONLY move the filler panel and j-clip
to the refrigerated (right) side
if right side will be mounted 'high'.
Fig. 15
Fig. 16
Fig. 17

Publicité

loading

Ce manuel est également adapté pour:

Lzo serieZotl8ws1a serieEzo serie