EN
IMPORTANT ASSEMBLY STEPS
When encountering this information icon during assembly,
please refer the relevant assembly step for important additional
comments.
Step 1:
Please note the base's direction.
Step 17:
Note that panels and profiles are connected in the right direction
and that profile holes are placed correctly as illustrated.
Step 22:
Door Assembly
Note the panels, profiles and holes directions.
Steps 24+25:
Attach side profiles to the door panel before inserting
screws no. 7444.
Step 28:
Anchor the shed on to a solid surface such as concrete,
asphalt or wood deck; use suitable screws and plugs.
(Screws and plugs are not supplied).
FR
PRINCIPALES ÉTAPES D'ASSEMBLAGE
Lorsque vous rencontrez cette icône d'information pendant
l'assemblage, veuillez vous référer à l'étape d'assemblage
correspondante pour d'autres commentaires importants.
Étape 1:
Please note the ba la porte peut être installée pour s'ouvrir vers la
gauche ou vers la droite. se's direction.
Étape 17:
Vérifiez que les panneaux et les profilés sont reliés dans la bonne
direction et que les trous des profilés sont placés correctement,
comme indiqué sur l'image.
Étape 22:
Assemblage de la porte
Notez les directions des panneaux, des profils et des trous.
Étapes
Veuillez vérifier que le profil du cadre est solidement fixé au panneau
24+25:
de la porte avant d'insérer les vis #7444.
Étape 28:
Ancrez l'abri sur une surface solide comme du béton,
l'asphalte ou de terrasse en bois; utilisez des vis et des chevilles
adaptées. (Les vis et les chevilles ne sont pas fournies).