3.3. Function tests
After control box commissioning:
Proceed to several opening and closing operations from control box, in local (control box)
and distant (remote) configurations.
Neutralize the electric command using the neutralization switch located in the control box
and check that local and distance operations are correctly inhibited.
4
Maintenance
4.1. Preventive maintenance
The Smartcloser and its accessories do not require any maintenance.
4.2. Corrective maintenance
In case of corrective maintenance asked by Ensto expert, please contact Ensto after-sales service.
5
End of product life
For any question or demand about end of product life requirements, please contact Ensto after-
sales service.
SMARTCLOSER - N°IFS NX2008287 / N° 72740_08
01.10.2020
99 (101)