Télécharger Imprimer la page

Pfister Avalon LF-48 Serie Instructions De Montage page 3

Publicité

Les langues disponibles

Les langues disponibles

7
7B
7A
7 SECURING FAUCET
Place Faucet (7A) to sink surface. From underneath sink, secure Faucet using Wingnuts
(7B). Hand tighten.
8
8B
8A
HOT
8 WATER SUPPLY CONNECTIONS
Connect water Supply Lines (8A) to Faucet Inlets (8B). Hot water supply lines go into
left inlet. Cold water supply lines go into right inlet. (Supply lines are not included).
Please follow manufacturer's instructions when installing supply lines.
ENGLISH
7A
7B
7B
8B
8A
COLD
9
9 POP-UP ROD CONNECTION
Insert Lift Rod (9A) into hole at the back of Spout (9B).
DRAIN BODY INSTALLATION
10
10 POP-UP INSTALLATION
Install and adjust Pop-Up (10A) using separate instructions supplied with the Pop-Up
assembly.
11
11 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
3
9A
9B
10A

Publicité

loading

Ce manuel est également adapté pour:

Avalon lf-048-cb0cAvalon lf-048-cb0kAvalon lf-048-cb0y