Installation / Instalación
STEP 3
Lock overflow head. When pressure
testing the system, screw on the red
test cap to seal the
STEP 5
Once
faceplate is in position,
push forward until the faceplate is
touching the tub face.
.
STEP 4
Remove the red test cap and insert
overflow head with the slots and turn
until it locks into position.
Revised
6/20/2018