IMPORTANT
Please read
these
instructions carefully before
you
start
to
assemble this greenhouse.
Keep
these
instructions
in
a
safe
place
for future
reference.
»
Customer
Service
For
assistance
with
assembly or for
replacement parts
-
please
log
onto
our website
or
call
our
service
line
(number
is
on
the title
page).
Additional
information
can
be
found
at
our website: www.palramapplications.com
»
Safety Advice
It
is
of utmost importance to
assemble
all
of
the parts according to
the
directions.
Do
not
skip
any
step.
We
strongly recommend
using
work
gloves during assembly.
Always wear shoes and safety
goggles
when working
with
extruded aluminium.
If using
a
step ladder
or power tools ensure that you
follow
the
manufacturer's safety advice.
Do
not
touch
overhead
power
cables
with
the aluminium profiles.
Do
not
attempt
to assemble the greenhouse
in
windy or wet conditions.
Dispose
of
all
plastic
bags. Keep
them out of
reach
of
small
children.
Keep
children away from
the assembly
area.
Do
not
lean
against or push the
greenhouse
during
construction.
Do
not
position
your greenhouse
in
an
area
exposed
to excessive wind.
Do
not
attempt
to assemble this greenhouse if you
are
tired,
have
taken
drugs or
alcohol or if you
are
prone to dizzy
spells.
Hot items such
as
recently
used
grills,
blowtorches
etc.
must not
be
stored
in
the
greenhouse.
Ensure
there
are no
hidden
pipes
or
cables
in
the ground before
inserting the
pegs.
This
product
is
designed to
be
used
as
a
greenhouse only.
»
Care
&
Maintenance
When
your greenhouse
needs
to
be
cleaned,
use
a
mild
detergent
solution
and rinse
with
cold
clean
water.
DO
NOT
use
acetone,
abrasive cleaners or
other
special
detergents to
clean
the clear
panels.
It
is
recommended
to
check periodically
that
roof
panels caps (plastic
part
329
&
profile
981)
are
set
in
place.
»
Tools
&
Equipment
Tape
measure
Work gloves
Silicone
spray/
Lubricant
Phillips
head
screwdriver
Leveler
Rubber
mallet
Adjustable Spanner /Wrench
T001
-
Special
tool
for
Screws
41
1
and nuts
412
3
»
Before
Assembly
[t
Selecting
a
site:
-
The
greenhouse
must
be
positioned
and
fixed
on
a
flat
level
surface.
-
Choose
a
sunny position away from
overhanging
trees.
[t
We
strongly
recommend this
greenhouse
being
secured directly to
a
solid
concrete
foundation.
When
doing
that
use
the
pre
drilled
holes
in
the
metal
base.
[
This
is
a
multi -part assembly best achieved
by
two
people.
Allow
at
least
a
half
a
day
for the assembly
process.
[t
Take
all
components
&
parts
out of
the
packages. Sort
the parts
and check
against
the
contents parts
list.
Parts
should
be
laid
out
close
at
hand.
Keep
all
small
parts (screws
etc.)
in
a
bowl
so
they do
not
get
lost.
Rt
Please
note multi -sided
profiles
are
used
in
this
greenhouse.
As
a
result
some holes
in
the
profiles
are
not
used
during
assembly.
[
Please
review
entire instructions before
starting.
Carry
out the assembly
steps
in
exact
order.
»
Notes
During Assembly
You
may
use
Silicon
lubricant
spray
in
order
to help you
slide the panels
into the
profiles.
Do
not spray the
Polycarbonate
panels.
Use
a
rubber mallet if
necessary.
MDuring
assembly you
will
encounter the
information
icon, please
refer
to the
relevant
assembly step for additional
comments
and
assistance.
Step
5: Part 994,
995
are
in
the back of the
greenhouse. Attaching
them determines the front
side
of
the greenhouse.
Steps
8,11:
The oval hole in
the
crossbars 256
should
always be assembled
to the
base
of
the greenhouse.
Step
9
Door Assembly:
Determines door direction.
Part
987
is
the
side
that the door
hinges will
be
located. The
door
can
be
installed
either
as
a
left or
right
hand door.These instructions
showa
right
hand
door
assembly.
Window Assembly
Step 31: Decide
on the
window's
location
before
assembly.
Window
can be
installed
in
one
of
the
indicated
options.
Step 44:
In
case
the
window
doesn't
closed
properly,
please
release
the
screws,
adjust the
profile
and
tighten
the
screw.
A\
Important
Recommendations
Firmly connect
the greenhouse to
a
level
position
immediately after completion
of the assembly.
In
order to anchor the greenhouse
use
the
designated manufacturer
anchoring
kit.
Anchoring
the greenhouse
can also
be done by
drilling
the
base
profiles
and
fastening it to the
ground
using
ground
screws
or spikes
(screws and
spikes are
not supplied).
Tighten
all screws once assembly
is
completed.
Screws
411
and
nuts 412
are used
thruoghout
the assembly
process.
Screws
411
are
to
be
assembled from
the outside and
nuts
412
from the inside of the
greenhouse.
Do
not
fasten
screws
and nuts
(411
&
412)
more than
23-
turns only.
Do
not
tighten them
until completion of the panels'assembly, if not specified otherwise.
However,
in
some
steps,
temporary tightening
of
a
few
screws may be
needed
to prevent
a
profile
from falling.
M
>I
CC