Télécharger Imprimer la page

GE AEE24 Manuel D'utilisation Et Instructions D'installation page 10

Publicité

Les langues disponibles

Les langues disponibles

InstaJiationInstructions
PREPARETHE AiR CONDiTiONER
(continues)
r_
Remove
the shipping
screws
located
on
the top of the case.
i
F1 Remove
the ground
screws
from
each
side of the case.
Keep them
inasafe
location.
NOTE: Be sure to save the ground
screws.
You will need them later in the
installation.
@
Slide the air conditioner
from
the case
by gripping
the base pan handle,
lifting
up on the air conditioner,
and pulling
forward.
Have a second
person
brace the
case. Do not pull or lift on the styrofoam
discharge
area.
Do not
pull
area--
damage
to the
unit may
result
%
FRONT
Eli Your unit may come with
internal
packaging.
This packaging
must
be
removed
prior to installing
the air
conditioner
back into the cabinet.
R] PREPARETHE CASE
r_
Attach
the top rail gasket
to the bottom
of the top mounting
rail.
r_
Install the top mounting
rail with 4 type A
screws from the inside
of the case. Press
firmly
to drive the screws
into the gasket
and through
the top mounting
rail.
Top mounting rail
D
Slide each side rail onto the edge of each
according
panel.
The figure
shows
the
orientation
of each accordion
panel and
side retainer
assembly
relative
to the case
from
a top view of the unit.
Side
Window FillerPanel
Side Rail
Window FillerPanel
r_
Slide the left and right
accordion
panels
into the top and bottom
mounting
rails.
Top _,_
__
Top_ight
Bottom
mounting
ra
0

Publicité

loading