Télécharger Imprimer la page

Palram Lean To Grow House 4x2-TwinWall Mode D'emploi page 3

Publicité

A
IMPORTANT
Please read
these
instructions carefully before you start to assemble this product.
Please
carry
out the
steps
in
the order
set
out
in
these instructions.
Keep these
instructions
in
a
safe
place
for future
reference
Once assembly
is
completed the product must
be
attached to the wall.
»
Customer Service
For
assistance
with
assembly or for replacement parts
-
please log
onto our website
or
call
our service line (number
is
on
the
title
page).
Additional information
can be
found
at our website: www.palramapplications.com
»
T001
(supplied)
»
Care &
Maintenance
When
your
Lean To
-
Grow House needs
to
be
cleaned,
use
a
mild detergent
solution
and rinse
with
cold clean water.
DO NOT use
acetone, abrasive cleaners or other special detergents to
clean
the
clear panels.
Before Assembly
Sort the parts and check according to the contents parts list.
Some
parts may
have sharp edges. Please be
careful when handling components.
»
Notes
During Assembly
You
may
use
silicon
lubricant
spray
in
order to help you slide the rubber
seal
(Steps 14a+18b) into the profiles.
Do
not
spray
the Polycarbonate
panels.
During assembly you will encounter the information icon,
please refer
to
the relevant assembly step for additional comments and
assistance.
Step
7: Please
note the assembly direction
of profile #7857.
Step
17:
A
7mm hole (3/8") must
be
drilled through the pre-drilled
hole
in
profile #7853 (Detail
a)
and
through
the Polycarbonate panel.
Step 20: Nut (#466) should
be
fully tightened
and
then slightly loosened
in
order to allow smoother motion of the pulley.
Step 21:
Please
note,
while assembling the
door, make sure it
is
parallel
to the
upper
rail
thus allowing
easier
motion.
If
it
is
not
parallel, the nuts should
be
a
bit
loosened,
repositioned
and
tightened
again.
Step 24: Anchoring the product to the wall (Details
a,
b &
c).
Choose
the appropriate
screws
for the type of wall you want to attach the
product
to. (Screws and screw anchors are
not supplied with the product).
Tighten
all screws once assembly
is
completed.
Do
not tighten
screws and nuts
(411
& 412)
until completion of
assembly process.
These
2
icons
indicate if screws'tightening
is
required or not.
A.

Publicité

loading