Télécharger Imprimer la page

Palram Snap & Grow 6x8+4 Extension Mode D'emploi page 4

Publicité

IMPORTANT
Please read
these
instructions carefully before you start to
assemble this
greenhouse.
Please
carry
out the
steps
in
the order
set
out
in
these instructions.
Keep
these
instructions
in
a
safe
place
for future
reference.
»
Safety Advice
We
strongly recommend the
use
of work
gloves
during assembly
.
Do
not
attempt
to
assemble
the greenhouse
in
windy
or
wet conditions.
Do
not touch
overhead power cables
with the aluminum
profiles. Always wear
shoes and safety goggles
when working with extruded aluminum.
Dispose
of
all
plastic bags safely
-
keep
them out of
reach
of
small
children.
The
greenhouse
must
be
positioned
and fixed on
a
flat
level surface. Do
not
lean
against or
push
the greenhouse during construction.
Keep
children away from the assembly
area. Do
not position your greenhouse
in an area
exposed to
excessive
wind.
Do
not attempt to
assemble this greenhouse if you
are
tired,
have taken drugs
or alcohol or if you
are
prone to dizzy
spells. If using
a
step ladder or power
tools
ensure
that
you
follow
the manufacturers
safety advice. Hot items such
as
recently
used grills,
blowtorches, should kept away from the greenhouse
walls.
We
recommend the greenhouse
is
bolted to
a
concrete
base or slabs (fix
hinges
are
not
supplied). However,
if
you
want to fix directly
in
to the concrete
ensure
there
are no
hidden
pipes or cables
in
the ground before inserting the
pegs.
»
Care &
Maintenance
When
your greenhouse
needs
to
be cleaned,
use
a
mild detergent solution and
rinse
with
cold clean water.
DO NOT use
acetone, abrasive cleaners or
other
special
detergents to
clean
the
clear panels.
For
replacement
parts
-
call
our
service line.
For
additional information
please
visit our web
site:
www.palramapplications.com
Tools
&
Equipment
Tape measure
Work gloves
Plastic
or rubber mallet
Phillipshead screwdriver
Step
ladder
Scissors
Spirit
level
-
For base
alignment
Cloth
»
General Advice
This
multi-part
assembly
is
best achieved by
two
people.
Allow
at least
half
a
day for the assembly
process.
Site
selection instruction-choose
a
sunny
level
position away from overhanging
trees. If
you
are
fixing
your greenhouse directly to
a
solid concrete
foundation
use
the
pre
drilled
holes
in
the metal
base
supplied.
The
component
parts should
be
checked and laid
out
close at hand. Keep all small parts
(screws etc.)
in
a
bowl
so
they
do
not get
lost.
Sort the parts and check against the contents parts
list.
Carry
out the
assembly steps
in
the order
set
out
in
the instructions.
The
front of the
greenhouse
is
the wall including the
door, and
the
back
is
the opposite wall.
After assembly
fit
the greenhouse to the
base using
connectors
no. 924
and
fit
the whole unit to
a
leveled final
You
may
use
Silicon
lubricant
spray
in
order to help you slide the profiles
on
the
connectors.
Do
not
spray
the Polycarbonate
panels.
Use
the rubber malet if
necessary.
Notes (by steps)
Step
3: Profile
821
should
be
placed on the left hand
side
to
be
connected to profile
822.
Profile
821
is
the one with the connector
at
the
end.
Step 4: After connecting profiles
816
to
each
other
clean
the connection
area
using
a
cloth.
Place
the
cover strip
on
the conection only when it
is
clean and
dry. press
the cover strip from one
side
of the connec-
tion to the other
as
mentioned
in
picture
4.
Step
7: Profile 800
& 801
should
be
aligned and con-
nected according to the
illustration
on page
7
a
&
b.
plug
23
should
be
inserted to
each
connection while
the two dots
on
the
front of
the plug should
be in
horizontal position for
easy
assembly.
Step 9:
Use
part
95 as
a
template
in
order to
measure
the gap between
posts 800
& 801
of the greenhouse
wall and
roof
area.
Step 10: Profile 806 should
be
placed on the right
hand
side.
Profile 805 should
be
placed on
the left hand
side
when viewed from the front.
Step 11: Slide the panel
7011
till
the end of the
rail
and insert it
into
it's
final position
as
shown
in
illustar-
tion
c
.
Step 12: Profile 808 should
be
placed on the right.
Profile 803
+
807
should
be
placed on the left.
Profile 804 should
be
placed on the right.
Step 15:
Be
careful to assemble the
window
in
the
position
as
shown on picture
16
a.
profile
809
should
be
placed
while the vent
is
closed to cover any gap.
Ensure
profile 809
is
fitted
correctly
as
shown on
picture
16
b.
The
lip on 809 should face
toward the
gutter.
Step 18: Slide the panel
7011
till
the end of the
rail
and
insert it
into
it's
final position
as
shown
in
illustartion
a
and
b.
Step 19: Step inside the greenhouse and turn
all 23
plugs
a
1/4
of
a
turn clockwise.
Step 20: Profiles 814 should
be
inserted from the four
corners
of the greenhouse, then insert profile
815
in
between them.
Step 22:
Ensure
you
use
long screw 450 to secure the
door
catch
43
as
shown
in
illustration
b.
Step 24:
Bend
the tab lock from the inside after
bending the
base
parts,
then lock it using screw
447.
Step 27:
You
should
tighten
screw
97
when profiles
807
&
808 are
aligned
and connected.
Steps 25,40: Anchor the greenhouse,
use
suitable
screws and plugs. (Screws
and plugs
are
not supplied).
!
Important
Recommendations
Firmly connect the greenhouse
to
a
level
surface
immediately after completion of the
assembly.
Anchoring this product to the ground
is
essential to its
stability
and
rigidity.
It
is
required to complete this stage
in
order for
your warranty to
be
valid.
Tighten
all screws once assembly
is
completed.

Publicité

loading