Sommaire des Matières pour Glacier bay BRIGHTLING GBBA018
Page 1
GBBA018 BRIGHTLING INSTALLATION MANUAL MANUEL D’INSTALLATION MANUAL DE INSTALACIÓN An installation video guide can be found on our Youtube channel: Un guide d’installation video est disponible sur notre chaîne Youtube: Una guía de instalación de vídeo está disponible en nuestro canal de Youtube: http://youtu.be/EmpHvs4Y-ko Questions, problems, need help? Call our customer service department at...
Page 3
FLOOR TRACING TEMPLATE GUIDE DE TRAÇAGE GUÍA DE SEGUIMIENTO Drain Floor cut-out for P-trap Rough-in zone for waste pipe Drain Ouverture dans le plancher pour p-trap Zone indiquée pour tuyau d’évacuation Drenaje Abertura en el piso de p-trampa Zona para la tubería de desagüe 23 7/16”...
Page 4
PART LIST LISTE DES PIÈCES LISTA DE PIEZAS PART # DESCRIPTION QUANTITY CODE # DE PIÈCE DESCRIPTION QUANTITÉ CODE PARTE # DESCRIPCIÓN CANTIDAD CÓDIO OVE FLEX-H2 flexible pipe OVE FLEX-H2 tube flexible OVE FLEX-H2 tubo flexible OVE FLEX-P flexible P-trap (NOT SUPPLIED) Available upon request.
Page 5
CAUTION ATTENTION ATENCIÓN You will need at least two people to install this product properly. In order to reduce the risks of personal injuries, do not support or lift the bathtub by the rim. Provide adequate support under the feet. The distributor is not responsible for any damage to the unit or personal property caused by improper installation.
Page 6
FLOOR TRACING TRAÇAGE SEGUIMIENTO 1.1. Use the floor tracing template supplied in this manual to trace the proper position of your supply pipes, your drain and your P-Trap rough-in. 1.2. Place the bathtub in the desired position on the floor, manually locate the proper position for your plumbing and trace the outline on the floor. 1.3.
Page 7
INSTALLATION OPTION #1: USING OVE FLEX-H2 INSTALLATION OPTION #1: UTILISATION DU OVE FLEX-H2 INSTALACIÓN OPCIÓN #1: USO DEL OVE FLEX-H2 3.1. Install the OVE FLEX-H2 felxible pipe by screwing it to the preinstalled bathtub drain outlet. Use teflon tape and/or thread sealant. 3.2.
Page 8
INSTALLATION OPTION #2: USING THE OVE FLEX-P INSTALLATION OPTION #2: UTILISATION DU OVE FLEX-P INSTALACIÓN OPCIÓN #2: USO DEL OVE FLEX-P 4.1. Install the OVE LEX-P flexible P-Trap by screwing it to the preinstalled bathtub drain outlet. Use teflon tape and/or thread sealant. Then, as shown in the illustration, connect the P-Trap to the Flexible Tube.
Page 9
INSTALLATION OPTION #3: USING REGULAR PVC PIPING INSTALLATION OPTION #3: UTILISATION DE TUYAU PVC RÉGULIER INSTALACIÓN OPCIÓN #3: USO DE TUBERÍAS DE PVC REGULARES 5.1. Apply Teflon Tape and/or thread sealant to the pre-installed bathtub drain. 5.2. Screw the provided 1-1/2 NPSM to SCH40 Pipe Adapter to the drain. Cut a 1-1/2 PVC Extension Tube to the desired length. Then connect it to the Adapter using PVC pipe sealant to join the parts together.
Page 10
SEALING SCELLAGE SELLADO BEFORE FIXING YOUR TUB TO THE FLOOR, ENSURE THAT YOU HAVE INSTALLED YOUR FAUCET (if applicable) AND THAT YOU HAVE CHECKED FOR LEAKS. 6.1. Test for leak by filling up the tub and let it drain. Then check all plumbing connections for leaks. 6.2.