Télécharger Imprimer la page

PF Jones 19030513PF Instructions De Montage page 14

Publicité

P
40
Set up trailer operation
41
/
87030695/16.01.2018
PFJones ltd, Nuttall street, Old Trafford, Manchester, M16 9JA, Tel- 0161 872 4755 email- info@pfjones.co.uk web- www.pfjones.co.uk
SETUP
1.
4.
2.
Ignition ON
P
The activation of the trailer functions has to be
carried out using the CITROËN Lexia tester as
follows:
• choose vehicle
• delivery
• equipment
• trailer control unit (BSR)
• installation of equipment
1x
3.
14/16

Publicité

loading