Description
Identification No.
Communication media
PLC => Mains-borne signalling
Control buttons
Operation
This product can simultaneously control groups of products (Actors) linked to it during the learning
buttons 1, 2, 3, 4, 5, 6, 7 or 8; it then becomes the scenario Leader
The scenario linked to button 1 (respectively 2, 3, 4, 5, 6, 7 or 8) will be started automatically on the appearance
of phase at the auxiliary input (respectively 2, 3, 4, 5, 6, 7 or 8).
Auxiliary products are:
- push-buttons
- switches
- clocks
- etc.
This product can control radio products through the RF/PLC interface Cat. No. 036 06/29
(1) Learn phase: Operation to associate products so that they can be controlled simultaneously from a central point.
This association is carried out by applying the learn scenario procedure on page 7.
(2) Scenario: Corresponds to the set of products (actors) that are associated with a command key.
Auxiliary inputs
Auxiliary inputs
(2)
.
6
LEARN button
LEARN indicator light
Control buttons
(1)
using