Section 2 Installation
IPT122 Series
2-9 IPT122 Electrical Installation
2-10 Installation/Entity Drawings Hazardous Location Applications
Figure 2-1 IPT122 Bottom and Side Views
2-4
3. Prepare the pressure transmitter for use
A. Verify integrity of the seal by appropriate helium leak-testing
procedures.
B. Turn the gas flow ON then OFF, 10 times to remove any particles
generated during installation. (The flow rate used should at least equal
the process flow specifications.)
C. Mechanical Installation is complete. Complete electrical connections as
noted in the next section.
Refer to Figures 2-1 through 2-3 for electrical connections.
Refer to Figures 2-4 through 2-7 for electrical connections.
Installation and Operation Manual
X-PR-IPT122-eng
Part Number 541B151AAG
December, 2017