Installation (continued)
9
Removing the plastic cap
□
Before installing the escutcheon (E), remove the
plastic cap (1) from the valve body (D) by twisting
the cap in a clockwise direction.
1
10
A
□
D
□
1
11
Please contact 1-855-HD-GLACIER for further assistance.
Adjusting the temperature
NOTE: The limiter on the valve can be set to allow partial
or full access to hot water by limiting how far the handle
can be turned to the hot side of the valve. The limiter is
typically set at the factory to allow only warm water to pass
through the valve. Follow the directions in this section if you
wish to adjust the amount of hot water that is allowed
through the valve. If you do not wish to adjust the amount
of hot water that is allowed through the valve, proceed to
the step 11, and skip over the step 10 (A, B, C).
Removing the sleeve and
inverter
Unscrew the sleeve (1) from the valve body (D).
Remove the inverter (2) from the valve body (D).
2
D
HOMEDEPOT.COM