Assembly instructions | Care information
• Observe the local building regulations and the snow load zones in your region.
• Before the assembly sort the parts and check the contents list according to the assembly
instructions.
• At least 2 persons are required to assemble the terrace roof.
• Follow the instructions and installation steps in the assembly instructions.
• The Twin-Wall Sheets do not walk on transverse running boards (at least 2 rafters).
• Point loads must be avoided absolutely
• Regularly remove snow from the roof
• Snow load: models with 3 m roof depth: 200 kg/m² and models with 4 m roof depth: 150 kg/m²
• It makes sense to install a snow guard above the terrace roof.
• Keep the gutter free of leaves, dirt and snow.
• The terrace roof must be installed on a flat, solid surface (for example concrete, concrete slabs).
• Clean the Twin-Wall Sheets with water and a mild detergent and do not use abrasives, acetone
or solvents!
• Defective or bent posts or beams must be replaced immediately.
• The wall connection profile must be installed at a height of at least 245 cm (measured at
the upper edge of the profile)
• As the cross beam can be moved by max. 60cm towards the house wall, this results in a higher
roof pitch (slope).
Colour and size deviations etc. within the usual tolerances reserved. Our recommendations do not
release the customer from the obligation to check the product on his own responsibility. In case of
doubt, please consult a specialist. Technical modifications reserved
13, 17, 19
Size 4, 5
17
TX25