Strip the cable for 27 cm and shorten the 3 power supply wires to 4 cm. Connect the yellow/
green earth wire to the fixed terminal provided on the motor.
Pass the earth wire of the motor power supply cable through the 1st free hole in the run stop
container.
Connect the earth wire to the aluminium support.
Connect the power supply cable to the clamps provided.
CAUTION: Make the connections according to the chart below (OPEN button with OPEN clamp,
CLOSE button with CLOSE clamp and connect the direct phase of the power supply
to the COM clamp).
B =
CAP =
Electrobrake
Capacitor
Screw the run stop cover back on.
Verify that the switch is on INS (In this phase the micro-switches do not work and the C1 and
C2 run stop cams are automatically regulated).
27
G
B