Télécharger Imprimer la page

heatwell H2O Serie Notice D'instructions page 7

Publicité

Les langues disponibles

Les langues disponibles

DK H
O
2
MAIN FEATURES
Six screws connection ½ "
Radiators prepared for both one-pipe and two-pipe systems.
Wall supports, 1 air-vent, caps, rawlplugs and screws are included.
All devices have been checked under a leak pressure test of 10 bar, which means a
maximum service pressure of 6 bar.
PH value must be between 5 and 8.
INSTALLATION
The heater is supplied in 2 parts: the accumulator Dual Kherr (DK) and the water radiator.
Cut the straps that hold the radiator to the Dual Kherr. Hold carefully the DK.
Installation and hydraulic connections
All manuals and user guides at all-guides.com
L = Length
A = Distance b/w
supports

Publicité

loading