IMPORTANT
Please read
these
instructions carefully before you start to assemble this greenhouse.
Keep
these
instructions
in
a
safe
place
for future
reference.
Customer Service
For
assistance
with
assembly or for replacement parts
-
please log
onto our website
or
call
our
service line
(number
is
on
the title
page).
Additional information
can be
found
at
our website: www.palramapplications.com
Safety Advice
It
is
of utmost importance to
assemble
all
of
the parts according to the directions.
Do
not
skip any step.
We
strongly recommend
using
work
gloves during assembly.
Always
wear
shoes and safety
goggles when working with extruded aluminium.
If using
a
step ladder or power tools ensure
that you follow the manufacturer's
safety advice.
Do
not touch overhead power cables
with
the aluminium profiles.
Do
not
attempt
to assemble the greenhouse
in
windy or wet conditions.
Dispose
of
all
plastic
bags. Keep
them out of
reach
of
small
children.
Keep
children away from the assembly
area.
Do
not
lean
against or push the greenhouse during construction.
Do
not position your greenhouse
in an area
exposed to excessive wind.
Do
not
attempt
to assemble this greenhouse if you
are
tired,
have
taken drugs or
alcohol or if you
are
prone to dizzy
spells.
Hot items such
as
recently
used
grills,
blowtorches
etc.
must not
be
stored
in
the
greenhouse.
Ensure
there
are no
hidden
pipes or cables
in
the ground before
inserting the
pegs.
This
product
is
designed to
be used
mainly
as
a
greenhouse.
Care &
Maintenance
When
your greenhouse
needs
to
be
cleaned,
use
a
mild detergent solution and
rinse
with
cold
clean water.
DO NOT use
acetone, abrasive cleaners or
other
special
detergents to
clean
the clear
panels.
It
is
recommended to check periodically that roof
panels caps (plastic part 329
&
profile
981) are set in place.
Tools
&
Equipment
Tape measure
Work gloves
Silicone spray
/
Lubricant
Phillips head screwdriver
Leveler
Rubber
mallet
Adjustable Spanner /Wrench
T001
-
Special
tool for
Screws
411
and nuts 412
0
Before
Assembly
Selecting
a
site:
-
The
greenhouse must
be
positioned
and fixed on
a
flat
level surface.
-
Choose
a
sunny position away from
overhanging
trees.
We
strongly recommend this greenhouse
being secured directly to
a
solid concrete
foundation.
When
doing that
use
the
pre
drilled
holes
in
the metal
base.
IR
This
is a
multi-part
assembly best achieved
by
two
people.
Allow
at least
a
half
a
day
for the assembly
process.
Take all
components
&
parts
out of
the
packages. Sort
the parts and check against
the contents parts
list.
Parts
should
be
laid
out
close at hand.
IR
Keep all small
parts (screws etc.)
in
a
bowl
so
they do not get
lost.
Please
note multi-sided profiles
are used in
this greenhouse.
As
a
result some holes
in
the profiles
are
not
used
during
assembly.
Please
review entire instructions before
starting. Carry out the assembly steps
in
exact order.
»
Notes
During Assembly
Please
note you install the
panels
with the
UV
protected
side
out
(marked
with
"THIS
SIDE
OUT")
and peel the film
strip covering the
panels.
You
may
use
Silicon
lubricant
spray
in
order to help you
slide
the panels
into the profiles.
Do
not spray the Polycarbonate
panels.
Use
a
rubber mallet if
necessary.
Steps 23, 28, 36, 42, 46, 48, 49, 58,
62, 66, 71: Please Note!
Each
of the
3
greenhouses come with
its
compatible
panels kit
as
shown
in
the content list and
in
the relevant assembly
steps.
MDuring
assembly you will encounter the
information
icon, please refer to the relevant
assembly step for additional comments and
assistance.
Step
3:
Make
sure
the
base
is
square by measuring the
diagonals and
level by using
a
spirit
level.
Step
6: Part
994, 995
are in
the back of the greenhouse.
Fixing
them determines the front
side
of the
greenhouse.
Steps
9, 12,
16:The
oval hole
in
the
crossbars
256 should
always be assembled
to the
base
of
the greenhouse.
Step
10
Door Assembly:
Determines door direction
door
post 987
is
where
door
hinges will
be
located.
Door
can be
installed
as
a
left hand door or right hand
door to your decision.
These
instructions show
a
right
hand
door
assembly.
Steps 58-64: Door assembly should
be
done according
to this decision.
Window Assembly
Step 43: Decide on the window's location before
assembly.
Window
can be
installed
in
one
of
the
indicated options.
Step
57
:
In
case
the
window
is
not closed properly,
please release
the
screws,
adjust the profile and tighten
the
screw.
Important
Recommendations
Firmly connect the greenhouse to
a
level
position
immediately after completion of the
assembly.
In
order to anchor the greenhouse
use
the
designated manufacturer anchoring kit.
Anchoring the greenhouse
can
also be
done by
drilling
the
base
profiles
and
fastening it to the
ground
using
ground
screws
or spikes (screws and
spikes are
not supplied).
Tighten
all screws once assembly
is
completed.
Please
note: Anchoring this
product to
the ground
is
essential
to
its
stability
and
rigidity.
It
is
required to complete this stage
in
order for your
warranty to
be
valid.
Screws
411
and nuts 412 are used
thruoghout
the assembly
process.
Screws
411 are
to
be
assembled from the outside and nuts 412 from the inside
of the greenhouse.
Do
not
fasten screws and nuts
(411 &
412)
more than
23-
turns only.
Do
not
tighten them
until completion of the panels' assembly, if not specified otherwise.
However,
in
some steps,
temporary tightening of
a
few
screws may be
needed
to prevent
a
profile from falling.