Télécharger Imprimer la page

Palram Voyager Shed Instructions De Montage page 3

Publicité

IMPORTANT
Please read
these
instructions carefully before you start to assemble this
shed.
Please
carry
out the
steps
in
the order
set
out
in
these instructions.
Keep these
instructions
in
a
safe
place
for future
reference.
mols
Rf
Equipment
Tool
-
(supplied)
these items
not supplied)
Safety
This shed
must
be
placed and fixed on
a
leveled surface to ensure
its
stability.
Make sure
that
screws and anchors are
compatible with
surface type.
IRSome
parts have metal edges.
Please be
careful when handling components.
IRAlways
wear gloves,
eye
protection,
and long sleeves when assembling or
performing
any maintenance on
your
shed.
Do
not attempt
assemble on days
with
strong winds or low temperatures. If using
a
stepladder
or power tools ensure
that
you
follow
the manufacturer's safety advice.
IRDo
not
stand on the roof.
IRDo
not
store
hot
items
such
as
recently
used grills,
blowtorches
etc.
in
the
shed.
IRHeavy
or sharp
articles should not
be
leaned against the wall panels.
IRTo
prevent suffocation,
do
not allow children to
play
with
packing materials.
IRShed
must
be secured by
drilling through floor
panels holes locations and inserting
suitable
screws
into ground
Before you
start
Consult your
local
authorities for
any
building limitations
or
permits required to
construct this garden
shed.
Complete
site
preparation before unpacking parts and beginning
assembly.
It
is
highly recommended to
be
assisted by
a
second person
in
some steps.
Sort the parts and check against the contents parts
list.
Please
take safety precautions during assembly.
During Assembly
When
encountering the information
icon, please refer
to the relevant
assembly step for additional comments and assistance.
This
icon indicates
that the installer should
be
inside the product.
Attention:
This
icon indicates
that
1
the installer should
be
outside the product.
,
It
is
important
to drill the
screws at
the
top of
the panel ridge and to
make
sure
that
screws
penetrate through the panel
in
order to
have
maximum
durability.
V
Make sure to position the panel's
bottom
ridge towards the
shed
floor
and
that
it
is
enclosing
it.
Step
1: Please
note the
base's
direction.
Step
17: Note
that
panel and profiles connected
in
the right direction
as
well
as
the
profiles holes placed correctly
as
illustrated.
Step 22: Door Assembly: note the
panels,
profiles and holes directions.
Step 24+25: Attach
side
profiles to the door panel before inserting
screws no. 7444.
Step 28: Anchor the
shed on
to
a
solid surface such
as
concrete or asphalt,
use
suitable
screws and plugs. (Screws
and plugs
are
not supplied).
*Please
note: Anchoring this product to the ground
is
essential to its
stability
and
rigidity.
It
is
required to complete this stage
in
order for your warranty to
be
valid.
Do
not tighten
screws
and nuts
(411
& 412)
until completion of assembly
process.
These
2
icons
indicate if screws'tightening
is
required or not.

Publicité

loading