Page 1
Two jumpers on the Comlink-2 card are used to identify the end of line for each communication line. The slave communication line uses jumper JP5 and the computer line uses JP4.
Page 2
2. PLUG THE COMLINK-2 IN THE CONTROLLER UNITS. a. Unplug EACH UNIT b. Plug the COMMUNICATION CARD IN the UNIT Open the cover. Drill a 5/16" hole through the bottom of the controller and thread the communication cable through the hole. Use the grommet provided to secure the cable.