Télécharger Imprimer la page

Palram Silver Line 6x8 Instructions D'installation page 21

Publicité

Les langues disponibles

Les langues disponibles

b
21
VENT SUBASSEMBLY
411
Assemble the handle
A306 to profile A271
and tighten screws
421(a) and nuts 422(a).
Slide panel P512 into
the groove in profile
A151(b). Slide profiles
A282 on each side of
panel P512 until they
fit the holes on profile
A151 ends and the two
holes on panel P512(c).
Connect corners with
screws 411 and nuts
412.
Slide the final profile
A271 (with the handle)
until it fits the holes on
both profiles A282 and
the two holes on the
panel P512(d). Connect
corners with screws 411
and nuts 412.
Tighten all screws and
nuts.
P512 / 1
A151 / 1
A282 / 2
All manuals and user guides at all-guides.com
b
411
A151
P512
411
412
A282
412
c
421
A271 / 1
A306 / 1
c
A282
411
A271
d
a
A271
422
A306
The brackets A323 should
be connected to profile
A260 using screws 445(a).
a
A323
445
Inside
445 / 4
22
A260
A323 / 2

Publicité

loading

Ce manuel est également adapté pour:

Green line 6x8