STEPS
1. Assemble arches 06-403 and 06-405. For the arches at each end, assemble arches 06-402 and 06-403
with 1¾" screws. Place 4 hooks M on each door rail 06-369 and attach the rails to end arches with 1¾"
screws and wing nuts.
2. Assemble arches with connecting pipes 06-371 and 06-374, using 2½" screws and wing nuts.
3. Insert legs 06-401 into arches 06-405 one side at a time, and then legs 06-400 into arches 06-402.
4. Connect legs 06-400 and 06-401 with the connecting pipes 06-371 and 06-374 using 2½" screws.
5. Attach the diagonals 06-369 between two legs, on the inside of the shelter, using 1¾" screws. (See schema)
6. Before you install the roof, make sure the distances between the legs (AC, BD) are 5 feet wide, including
the legs. Also verify that diagonal distances AD and BC are equal, and lengths AB and CD are equal.
7. Place cover over the completed structure making sure that the triangle is at the front of the shelter. Attach all
the straps inside of the roof to the structure poles going completely around the garage. Tie firmly the inside
ties to bars.
8. Place your shelter where you want to install it and close the door before anchoring the structure to the ground
with the brackets K and nails J. The structure has to be anchored on a flat leveled surface as asphalt,
concrete, etc. Additionnal anchors are not included.
9. Door has to be attached with elastics and S hooks.
STEP 6
A
B
STEP 8
C
D
STEP 7
STEP 9