STEP 3
Connect Vertical and Horizontal Tubes as shown. Make sure the side holes on Vertical
Tubes are oriented the same way and holes on Horizontal Tubes are facing outside.
P3
Side Holes
STEP 4
Position frame in between Legs and secure with two screws on each side.
Make sure frame is oriented correctly.
UPDATED AS OF: 04/03/2020
P4
B
5 of 6