Télécharger Imprimer la page

Zephyr UBV24C01BG Guide D'utilisation, D'entretien Et D'installation page 13

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions
Installation Clearance Requirements cont.
When installing the beverage cooler under a counter, follow the recommended spacing
dimensions shown.
The cabinet should allow at least 24" for the width and 34" for the height to
accommodate the beverage cooler.
Once you are ready to install the unit, you must adjust the feet to level the
beverage cooler.
Installing the Handle
1.
Push aside the door gasket on the side
you wish to install the handle. Under the
gasket you will see two designated holes
for handle installation and pre-installed
screws.
2.
Install the handle tightly as shown with
two screws, lock washers and flat washers
pre-installed.
13

Publicité

loading

Ce manuel est également adapté pour:

Ubv24c01bg1164545juy