Télécharger Imprimer la page

Sojag 500-6153675 Guide D'assemblage page 36

Publicité

NOTE:
The netting should be installed starting in the middle of the 12 feet
side of the unit, wrap around the inside of the post, and finish the
installation in the middle of the next side of the unit. The zippers
to close the netting will therefore meet in the center of the each
side of the sun shelter.
NOTE - OPTIONAL CURTAIN:
For optional curtains, install the curtain first on the track closest to
the ogee then install mosquito netting on the track closest to the
inside of the shelter.
Step 15
15.1 Install the mosquito netting (Z1) along the tracks
by inserting the hooks (Q) one at a time into the
eyelets found along the top border of the netting.
Repeat for all four netting panels (Z1).
Q
36
X
36
All manuals and user guides at all-guides.com
NOTE :
Les moustiquaires doivent être installées à l'intérieur de l'abri,
en commençant par le milieu d'un côté de 12 pi de l'abri et en se
terminant au milieu du côté adjacent. Les fermetures éclair vont
alors se rencontrer au centre de chacun des côtés de l'abri.
NOTE - RIDEAUX OPTIONNELS :
Pour les rideaux en option, installer les rideaux en premier sur le
rail le plus près des moulures et installer ensuite les moustiquaires
sur le rail qui se situe le plus loin de la moulure.
Étape 15
15.1 Installer les moustiquaires (Z1) sur les rails en
Z1
4
X
© Sojag inc. 2016
insérant les crochets (Q), les uns après les autres,
dans chacun des oeillets.
Répéter cette étape pour les quatre moustiquaires (Z1).
Z2
4
X

Publicité

loading