Main beam
Make sure plate marking A is at the top for main beam installation
1.)
CS 8x120
screws are usually used
for main and secondary beam made of hardwood
Secondary beam
1.)
B
Screw the clamping jaw 2 on top
in the positioning hole with horizontal
screws 9.1 (8x240)
Page 7/9
MEGANT® 150x50
Install Megant Concealed in main and secondary beam
install horizontal screws 8
connector plate 1
2.)
A
8
Make sure plate marking B is at the top
for secondary beam installation
install horizontal screws 8.1
(SK 8x240)
Connector
plate 1
2.)
8.1
9.1
Assembly Instructions
Screw inclined screws 7 into connector
plate 1 from top to bottom in rows
max. tightening torque Mt = 20Nm
(ensure they are tightened firmly)
7
Screw inclined screws 7 into
connector plate 1 from top to
bottom in rows max. tightening
torque Mt = 20Nm
(ensure they are tightened firmly)
3.)
7
Screw 1-3 threaded
rods 4 into lower clamping
jaw 2 so that they
are flush on the other
side of threaded hole
ALU AW 6082
3.)
Allen Key
ISK SW
8
M 20