Télécharger Imprimer la page

GreenWorks Commercial GB 500 Guide D'utilisation page 10

Publicité

Les langues disponibles

Les langues disponibles

All manuals and user guides at all-guides.com
ASSEMBLy
ASSEMBLING THE BLOWER TUBE
WARNING
To prevent accidental starting that could cause serious personal injury, always remove the battery
pack from the tool when assembling parts.
1. Align either of the grooves on the tube with the tabs on the blower housing. Push the tube onto
the blower housing until the tab engages the grooves (fig. 2).
Tab
Tube
Groove
Fig. 2
2. Turn the tube in the direction of the arrow until both of the tabs slide into the lock positions .
Clockwise to Lock and Counter Clockwise to remove (fig. 3).
Unlock
Lock
Fig. 3
Lock position
10

Publicité

loading

Ce manuel est également adapté pour:

2402602