WALL PREPARATION:
STEP 1
The wall opening required for a "WSC" SLEEVE is 17 1/4" high by 27 1/4" wide.
STEP 2
LINTELS must be used in opening of brick veneer and masonry walls to support the material above the "WSC" SLEEVE.
The following considerations should also be given:
A. Adjustable SUB-BASE SB–89 or other unit support must be provided for panel wall type construction and for
walls less than 8" thick.
B. A minimum distance of 1" must be allowed on all sides of the unit to adjacent wall and floor. Where the sub–base
is required, the minimum distance from the floor to the sleeve must be 3 1/2". To minimize chances of short
cycling of the compressor, the minimum clearance between the ceiling and the top of the unit should be 24".
(See Figure 1).
FIGURE 1
MINIMUM OF 24" REQUIRED
FROM TOP OF UNIT TO CEILING.
MINIMUM OF 1"
SPACING REQUIRED
ON ALL SIDES OF
1" MINIMUM
3 1/2" FOR
SUBBASE
920-037-01 (8-05)
All manuals and user guides at all-guides.com
INSTALLATION INSTRUCTIONS
FOR "WSC" SLEEVE
MOUNTING HARDWARE PROVIDED
ITEM
DESCRIPTION
NO.
SCREW, #12A X 2"
1
INSIDE
WALL
THE UNIT.
QTY.
5
LINTELS
WSC SLEEVE
DRAIN
EXTENSION
9/16" MINIMUM
OUTSIDE WALL

Publicité

loading

Sommaire des Matières pour Friedrich WSC

  • Page 1 The wall opening required for a "WSC" SLEEVE is 17 1/4" high by 27 1/4" wide. STEP 2 LINTELS must be used in opening of brick veneer and masonry walls to support the material above the "WSC" SLEEVE. The following considerations should also be given: A.
  • Page 2 STEP 4 The "WSC" SLEEVE must also be installed with a downward tilt toward the outside of the building. If a level is placed so that it rests on the FRONT and BACK UNIT REST as shown in Figure 2, a properly installed unit provides a 1/2 bubble slope to the outside of the building.
  • Page 3 PULGADAS PREPARACION DE LA PARED: PASO 1 La abertura necesaria para la BASE DE EMPOTRAJE "WSC" es de una altura de 17–1/4" pulgada por 27–1/4" pulgada de ancho (438 mm x 692 mm). PASO 2 Deben emplearse zapatas (lintels) para sostener el material encima de la base de empotraje en aberturas de paredes enchapadas de ladrillo o de albañilería.
  • Page 4 Después de sacar de la caja la BASE DE EMPOTRAJE “WSC”, saque el PANEL DELANTERO estriado. Para la instalación inmediata de la base de empotraje WSC y la unidad (salte este paso si va a instalar la unidad en la base de empotraje WSC más tarde).
  • Page 5 VIS, Nº 12A X 2" PRÉPARATION DU MUR ÉTAPE 1 Pour une enveloppe WSC, l’ouverture du mur doit mesurer 17-1/4" de haut par 27-1/4" de large (438 mm x 692 mm). ÉTAPE 2 Il faut utiliser des linteaux dans les ouvertures de murs à parement de brique ou de maçonnerie pour supporter les matériaux au-dessus de l’enveloppe WSC.
  • Page 6 Mettre du mastic tout autour de l’ouverture, à l’intérieur et à l’extérieur, entre l’enveloppe et le mur. ÉTAPE 4 S’il faut faire de la maçonnerie ou si le châssis WSC est installé à une date ultérieure, remettre en place le panneau avant ondulé enlevé à l’étape 1.
  • Page 7 All manuals and user guides at all-guides.com 920-037-01 (8-05)
  • Page 8 All manuals and user guides at all-guides.com FRIEDRICH AIR CONDITIONING CO. Post Office Box 1540 · San Antonio, Texas 78295-1540 4200 N. Pan Am Expressway · San Antonio, Texas 78218-5212 (210) 357-4400 · FAX (210) 357-4480 www.friedrich.com Printed in the U.S.A.