Télécharger Imprimer la page

Champlain ACM-41AS Instructions D'installation page 2

Publicité

ACM-41AS
STEP 1
Attach two of the feet (1) onto
one of the "U" shaped ladder
bases (P1) using a stainless
steel screw (2), a stainless
steel washer (3) and a plastic
cap (4) for each pad.
STEP 2
Insert the ladder frame (P2)
into the assembled base (E1).
Adjust the height of P2 plus
E1 for the height of the pool,
48", 52" or 54". Secure the
ladder base (E1) to the ladder
frame (P2) by inserting four
bolts (5) into the four predrilled
holes and fastening them with
four washers (6) and four nuts
(7).
STEP 3
NOTE: In this step alignment
is critical. Petroleum jelly may
be used if necessary to make
the fit easier.
Insert the assembled ladder
(E2) into the handrails (P3).
Make sure that the locking
pins located on either side of
the ladder frame (E2) have
snapped into place inside the
handrails.
All manuals and user guides at all-guides.com
P1
³
»
·
¿
P2
E1
´
E2
E1
ÉTAPE 1
Fixer les pieds (1) à la base
de l'échelle (P1) en utilisant
deux rondelles en acier
inoxydable (3) et deux vis
(2). Insérer les deux
bouchons (4) sous les pieds.
E2
ÉTAPE 2
Insérer le cadre de l'échelle
(P2) dans la base assemblée
(E1). Selon la hauteur de la
piscine (48"; 52"; 54"),
ajuster la base E1 à la
48"
hauteur désirée. Insérer les
52"
quatre boulons (5) dans les
54"
trous déjà perforés et bien
serrer avec les quatre
rondelles (6) et les quatre
écrous (7).
²
ÉTAPE 3
NOTE: À cette étape
l'alignement est critique. De
la gelée de pétrole peut être
P3
utilisée pour faciliter
l'assemblage. Insérer le
cadre de l'échelle (E2) dans
les rampes (P3). S'assurer
que les ergots d'arrêt situés
de chaques côté du cadre de
l'échelle (E2) soient bien
enclenchés dans les rampes
(P3).
E3

Publicité

loading