Télécharger Imprimer la page

HAMPTON BAY BPT12-13D Guide D'utilisation Et D'entretien page 7

Publicité

Les langues disponibles

Les langues disponibles

Installation
1
Preparation for mounting
Determine thickness of finished ceiling board
(* measurement shown).
Place main body (A) against ceiling joist in desired
location.
Ensure bottom of main body (A) hangs down below
joist to account for finished ceiling board.
NOTE: For example, if thickness of finished ceiling board
is 3/4 in. then main body (A) should hang down from joist
3/4 in.
All manuals and user guides at all-guides.com
2
7
Mounting fan body
Use long wood screws (BB) to loosely attach both sides
of main body to joist (right side shown).
Ensure ventilation fan is level and that proper clearance
is given for finished ceiling board.
When main body (A) is level and in the intended
location, tighten screws (BB) on both right and left
side of main body (A).
Please contact 1-877-527-0313 for further assistance.
www.hamptonbay.com

Publicité

loading

Ce manuel est également adapté pour:

317-768