EnergAir Metacentre CX Box Manuel Technique page 68

Table des Matières

Publicité

Customer
Installation/Site
Software
3
bar
m
/min
kW
VA Hz
** variable speed/regulaton
S01
PH
High Pressure Set Point
S01
PL
Low Pressure Set Point
S02
RT
Regulation Type
S02
AD
Network Address
S02
P>
Pressure Units
S02
T>
Temperature Units
S02
IA
i-PCB Alarm Input
S02
FL
Fan Temp. Low Level
S02
FH
Fan Temp. High Level
S02
FR
Fan Minimum Run Time
S02
HT
Heater Control Temp.
S02
IH
Inhibit Timeout
S02
DO
Drain Open Time
S02
DI
Drain Interval Time
S03
EN
Enable
S03
S%
Minimum % Speed
S03
FL
Frequency @ S%
S03
FH
Frequency @ 100%
C01
RC-P:
Proportional Factor
RC-I:
Integral Factor
C01
AC-%L
%Load Minimum
AC-AH
4-20mA High Limit
AC-AL
4-20mA Low Limit
AC-AO
4-20mA Optimum Level
AC-AU
4-20mA Offload Level
C01
VC-NV
Number Of Valves
VC-V1
V1 %Load
VC-V2
V2 %Load
VC-V3
V3 %Load
VC-V4
V4 %Load
CX Commissioning Form
Contact
Phone
Ser No.
Manufacturer
Model/Type
Working Pressure
Full Load Capacity
Minimum Load Capacity**
Full Load Power
Minimum Load Power**
Voltage
Full Load Current (FLC)
Min/Max Frequency**
L
1
bar
o
+V
0
1
Customer Ref:
Internal Ref:
Commission Date
Commission Engineer
AR
3S
5S
2
3
4
5
6
7
psi
o
C
F
0V
1
2
3
4
Metacentre CX Box
bar/psi
3
m
/min
3
m
/min
kW
kW
V
A
Hz
bar/psi
bar/psi
V
8
9
11
12
10
o
o
C/
F
o
o
C/
F
sec
o
o
C/
F
sec
sec
sec
%
Hz
Hz
%
mA
mA
mA
mA
%
%
%
%
Page 67

Publicité

Table des Matières
loading

Produits Connexes pour EnergAir Metacentre CX Box

Table des Matières