I CONTENTS (5 PACKAGES)
- 1 TOP OF THE FRAME (1) -
2 HIGHT UPRIGHTS (2)+ 1 BOAT HOOK-
2 LOW UPRIGHTS (3)-
2 ADJUSTABLE BASES (11)+SCREW (12) , S
ECIAL NUTS (10)
II INSTALLATION OF THE APPARATUS
- FIT THE ITEMS (1),(2) AND (3) ONTO THE FLOOR.
- FIX THE RINGS (16) WITH LOCK NUT (17).
- ADJUST THE BASES (11) (AT HOLE N ° 4 FOR A 200mm MAT AND
STATUTORY HEIGHT A=2550mm)
III INSTALLATION OF THE CABLE SYSTEM
- INSTALL THE 2 AHEAD CABLES (14) AND THE 2 BEHIND CABLES (4) WHILE
FIXING THEM ONTN THE RING FRAME WITH THE LINKS (15)
IMPERATIVELY. THE TENSIONERS (15) MUST BE ON THE SAME SIDE (5500mm).
IV FINAL INSTALLATION AND
ADJUSTMENT
- PLACE THE PIVOTS (12) WHEN HAVING DRILL 2 HOLES Ø=12 ,
L= 45mm AXIS 2600mm ON FLOOR drg1.
- RAISE THE RING FRAME WITH AT LEAST 6 PEOPLES.
- AJUST AND BALANCE THE CABLES TO BE SYMETRIC.
- IMPORTANT : DO VERIFICATION ABOUT GOOD LOCKING OF THE
4 CABLE'S PULLEYS.
Drg 2
A=2550
BEFORE INSTALLATION, YOU MUST BE SURE THAT:
- THE CONCRETE, WHERE WILL BE INSTALLED THE ANCHORS, HAS A COMPRESSION RESISTANCE 25 MPa.
- THE BEDDING REALISED CAN SUPPORT A TRACTION STRENGHT OF 800 DaN.
BEFORE EACH UTILISATION, MAKE A COMPLETE VERIFICATION OF THE CABLES (SHUTING OF THE TENSIONERS, TIGHTENING OF THE
ANCHORS IN THE FLOOR ...)
ASSEMBLY INSTRUCTIONS
RING FRAME
}
1 PACKAGE 370/06
}
1 PACKAGE 370/07
}
1 PACKAGE 370/04
FIX WITH (10)
AND (12) drg 2.
TO BE SHUT
1 5
1 4
1 3
1 2
1 1
1 0
- 2 BEHIND CABLE SYSTEMS (4) WITH CHAIN (6)
AND KARABINER (7)
- 2 AHEAD CABLE SYSTEMS (14) WITH TENSIONERS (13)
- 2 PIVOTS (9)
- 1 PAIR OF RINGS (16) + CABLES