Typical Installation - Broan HLB3 Instructions

Masquer les pouces Voir aussi pour HLB3:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

TYPICAL INSTALLATION

MOUNTING (New Frame Construction)
10" ROUND DUCT
ADDITIONAL
1½" FRAMING
Blower
factory-
shipped
in straight
through
discharge
position.
Mounting brackets factory-
shipped in position for
½" ceiling material.
Factory-shipped unit installed in new construction.
MOUNTING (Existing Frame Construction)
8" TO 10" ROUND
10" ROUND DUCT
(OUTLET)
CEILING JOIST
(16" centers
shown)
MOUNTING
BRACKETS
(Attached to
opposite sides
of housing &
upside-down)
Blower factory-shipped in straight-through
discharge position.
IMPORTANT: Remove shipping tape from damper
Remove the shipping tape from the damper flap and make sure
that damper flap opens and closes freely inside the ductwork. Use
duct tape to make ductwork connections secure and air-tight.
Remove shipping ring from blower inlet
Remove the shipping ring from the blower inlet before operating
the ventilator.
8" TO 10" ROUND
TRANSITION
10" ROUND
CEILING JOIST
(16" centers
MOUNTING SCREW
TRANSITION
10" ROUND
2 X 4 FRAMING
(wide side down)
TYPICAL INSTALLATION
MOUNTING USING HANGER KIT (included)
DUCT
HANGER
KIT CHAIN
HANGER KIT
EYE-BOLT
shown)
8" TO 10"
ROUND
TRANSITION
10" ROUND
DUCT
(OUTLET)
Blower factory-shipped in straight-through
DUCTING (Horizontal blower discharge)
DUCT
(INTAKE)
ROUND DUCT
Two ways to connect ductwork to a factory-shipped unit.
ACCESS PANEL
discharge position.
ROUND
ELBOW
Page 2
HANGER
KIT BOLT
& WASHER
EXTENSION
SPRING
10" ROUND
DUCT (INTAKE)
HANGER
KIT NUT &
WASHER
MOUNTING
BRACKET
GRILLE NUT
(Install into
square holes in
housing)
ACCESS
PANEL SCREW
ROOF CAP
WALL
CAP

Publicité

Table des Matières
loading

Table des Matières